Page Header

  • Focus and Scope
  • Peer-Review Process
  • Editorial Team
  • Reviewers Acknowledgement
  • Author Guidelines
  • Online Submission
  • Publication Ethics
  • Our Policies
  • Copyright Notice
  • Publication Fees
  • Journal History
DOWNLOAD TEMPLATE

User
Information
  • For Readers
  • For Authors
  • For Librarians
  • Home
  • About
  • Login
  • Register
  • Search
  • Current
  • Archives
Home > Archives > Vol 4, No 1 (2023)

Vol 4, No 1 (2023)

Table of Contents

Articles

Penerapan Kualitas Beton Cor Kolom Menggunakan Metode Taguchi Dalam Proyek Kontruksi Dengan Pendekatan Metode Triz Di PT XYZ, Tbk
10.30998/.v4i1.4694
Ditha Aulia Trilestiorini
PDF
1-8
ANALISIS TINGKAT KEPUASAN PELAYANAN PELANGGAN TOYOTA HOME SERVICE (THS) DENGAN METODE KANO DAN KANSEI ENGINEERING
10.30998/.v4i1.5743
Rekky .
PDF (Bahasa Indonesia)
9-18
Penentuan Harga Pokok Produksi Garam Berdasarkan Penerapan Metode Full Costing, Variable Costing, dan Activity Based Costing Pada PT XYZ
10.30998/.v4i1.6461
Wahyu Fitriyanto
PDF
19-22
Analisis Peramalan Pendapatan CafXYZ Menggunakan Rantai Markov
10.30998/.v4i1.6837
Daffa Ahmad Elangga, Putri Priharyanti, Winindi Murobi Maulia
PDF (Bahasa Indonesia)
23-28
Analisis Pengendalian Kualitas Produk U-Shaped Tube Menggunakan Metode Fault Tree Analysis (Fta) Dan Taguchi Di Pt. Pratika Nugraha Jaya
10.30998/.v4i1.4703
Baresy Magribiono Junior
PDF (Bahasa Indonesia)
38-43
Analisis Pengukuran Kinerja Serta Upaya Perbaikan Menggunakan Metode Performance Prism dan Traffic Light System
10.30998/.v4i1.10636
Aditya Widiantoro
PDF (Bahasa Indonesia)
29-37