Optimasi Produksi Pada Ukm Pembuatan Peyek Dengan Menggunakan Metode Goal Programming
Abstract
Full Text:
PDFReferences
Anggraeni, W., Vinarti, R. A., Tyasnurita, R., & Permatasari, J. (2015). Production planning optimization using goal programming method in Habibah Busana. Journal of Advanced Management Science Vol, 3(4).
. Bolomba, A., Sahari, A., & Jaya, A. I. METODE GOAL PROGRAMMING (STUDI KASUS: UKM IBARAKI BAKERY KOTA PALU).
. Dhoruri, A., Lestari, D., & Ratnasari, E. (2017). Sensitivity analysis of Goal Programming model for dietary menu of diabetes mellitus patients. International Journal of Modeling and Optimization, 7(1), 7.
. Jenal, R., Ismail, W. R., Yeun, L. C., & Oughalime, A. (2011). A cyclical nurse schedule using goal programming. Journal of Mathematical and Fundamental Sciences, 43(3), 151-164.
. Kameshwaran, S., Narahari, Y., Rosa, C. H., Kulkarni, D. M., & Tew, J.
. D. (2007). Multiattribute electronic procurement using goal programming. European Journal of Operational Research, 179(2), 518-536.
. Novitasari, S. A., & Endang Wahyu, H. (2017). Pendekatan Metode Goal Programming Dalam Optimasi Perencanaan Produksi (Studi Kasus UD. Imaduddin).
. Paath, P. C., Tjakra, J., & Dundu, A. K. T. (2015). Analisis Pengendalian Bahan Proyek Pembangunan Dengan Metode Goal Programming Prioritas (STudi Kasus: Proyek Pembangunan Gedung Sekolah Eben Haezar). Jurnal Sipil Statik, 3(5).
Refbacks
- There are currently no refbacks.